In July 2020, Gloryholder Liquefied Gas Machinery (DL) Co., Ltd. (LGM Engineering) was awarded an order from Japan Oshima shipyard for design and supply of the LNG fuel gas supply system for 95k dual fueled bulk carrier.
On June,2020, Gloryholder Liquefied Gas Machinery (DL)Co., Ltd. (LGM) has signed a contract to design and supply LNG fuel gas supply system for two 13,000 DWT Chemical Tankers with Jiangsu New Yangzi Shipbuilding Company Limited (YZJ).
Gloryholder Liquefied Gas Machinery (DL) Co., Ltd (LGM) has signed a contract to design and supply LNG fuel gas supply system for two 22,000 DWT Chemical Tanker with Wuhu Shipyard Co., Ltd.
In June, 2019 Gloryholder LGM signed contract with Wuchang Shipbuilding Industry Group Co., Ltd (“WS”) to supply LNG fuel gas systems for eight 4000HP LNG powered PSVs being built for China Oilfield Services Limited (COSL).